BUSINESS PLAN 2024 (EXAMPLE)
£15,000.00
The proposed structure of the business plan takes into account the specifics of the economy of the region of implementation and meets international requirements and is recommended by ICC. It is based on the UNIDO methodology for investment project appraisal and financial analysis methodology defined by IAS international standards. The form of the proposed reports complies with the International Financial Reporting Standards (IFRS). This makes the results of calculations understandable to foreign investors.
Description
The goal is to create a new production facility and re-profile the existing one, standardize materials and components, export products, manufacture and sell industrial goods, and organize a distribution network for the manufactured products. On the basis of the enterprise UKRAINIAN POWER-METALLURGICAL COMPANY L.L.C. in Nizhyn, Chernihiv region (Ukraine), it is proposed to create a high-tech, highly profitable production of polycrystalline silicon. The project envisages modernization and complete re-profiling of the existing production, purchase of equipment and creation of modern technological schemes that will increase the output of innovative materials that meet market requirements and imported analogues of leading manufacturers.
The production base is located in the northeastern outskirts of Nizhyn. Google coordinates: 51°04’06.9 “N 31°54’28.6 “E
The project envisages: Construction of a 15 MW rooftop polycrystalline silicon production plant with integrated renewable electricity generation (RES) in Ukraine, launch of induction furnaces for smelting high quality polycrystalline silicon, which is in high demand in the European Union market and is the main component of the production of panels for solar power plants.
The generated electricity fully meets the company’s own needs, and the surplus is sold through the national power grid.
Sales of finished products on the European market.
Planned jobs A total of 105 jobs will be created under the project
Localisation – Ukraine, Poland, and the UK.
Ukraine – Kyiv region (Kyiv oblast) – Kyiv city.
Chernihiv region (Chernihiv oblast) – Nizhyn.
Dnipro region – the cities of Kryvyi Rih, Nikopol, Marhanets, Dnipro.
The project involves:
Production and sale of polysilicon of “electronic” (semiconductor) and “solar” quality for the needs of photovoltaics;
Project start date – 01.08.2023 Duration – 60 months.
Reviews
There are no reviews yet.